Skip to main content
City of Foster City Home

Foster City Recreation Center Rebuild Project

The current Recreation Center consists of the original building that was built in 1974 and two expansion wings that were constructed in the 1990s. The current structure contains approximately 18,500 square feet of meeting room/user space in the ~32,000 square foot building, with the remaining space allocated to lobbies, storage, mechanical rooms, and long hallways to access the phased additions. Because the building was originally three separate structures that were all combined into one building with one roof in 1997, multiple roof penetrations were added to install HVAC equipment and aesthetic screens on the flat deck of the roof. Due to the construction history and the piecemeal way it was constructed, several structural issues are known or anticipated related to water intrusion.

At the January 31, 2022, City Council Special Meeting, the City Council accepted the Recreation Center and Parks System Survey results and proposed to move forward with the “build-to-budget” option with a not-to-exceed budget of $55 million with $36 million from Capital Asset Acquisition and Replacement Fund (CAAR Fund 326) and $19 million from General Fund reserves.

On November 21, 2022, the City Council awarded the professional design, bidding, and construction support services to Group 4 Architecture, Research + Planning, Inc. (“Group 4"). The project is currently in the program confirmation/schematic design phase. Group 4’s scope of work will continue through the construction of the project which is anticipated to be completed in 2026.

The Planning Commission and Parks and Recreation Committee held two previous joint study session meetings on March 2, 2023, and April 6, 2023. At these meetings the design team received input from the Commissioners, the Committee members and public participants on site analysis, site design values, programming, site options and building design options.

At the regular City Council meeting on April 17, 2023, the Council directed staff to include the development of the Waterfront Masterplan as part of the schematic design phase of the project. The Waterfront Masterplan will address the edge of the lagoon and will extend from the boat launch to the amphitheater, it will provide a cohesive site design for the project.

At the regular City Council meeting on May 15, 2023, the Council confirmed the recommendation of the Project Task Force, the Planning Commission, and the Park and Recreation Committee to proceed with developing Site Option 1, which extends the existing parking lot to the north, and the Gullwing Two-Story building design option for the development of the schematic design for the new recreation center project. 

Want the latest news and updates related to the Foster City Recreation Center Rebuild Project?

Phases

Phases overview
Phase 3: Community Outreach Round 1
Community Outreach Round 1
Phase 4: Preliminary Schematic Design
Preliminary Schematic Design
Phase 5: Community Outreach Round 2
Community Outreach Round 2
Phase 6: Final Schematic Design
Final Schematic Design
Phase 7: Construction Documents
Construction Documents

Community Outreach Round 2

May 25, 2023 7:00 AM - June 12, 2023 7:00 AM

The second round of community outreach for the Foster City Recreation Center Rebuild project includes an online survey (which will be live between May 25 and June 11, 2023), pop-up kiosks, and an open house where you can provide input on the design of the new Recreation Center.

Find opportunities to participate under the "Events" tab on this website.

For the initial phase of the project, a multilayer community engagement plan has been developed for the project to ensure broad input from the community, community leaders, staff, and City Council. The first round of community outreach was completed in March of 2023, and focused on building and landscape design. The design team collected responses from over 1,000 community members through an online survey, public meetings, and pop-up kiosks at community events. The results from this first round of outreach was synthesized into project goals and objectives which were confirmed with the community, Recreation Center Project Task Force (RCPTF), Parks and Recreation Committee, Planning Commission, and staff. These goals and objectives were used to guide the development of a conceptual design for the building and site which was accepted by the City Council at their meeting on May 15, 2023.

This second round of community outreach focusses on gathering input on the Waterfront Master Plan, as well as the exterior materials and colors of the new recreation center building. The design team will use input gathered during this round of outreach to further develop and refine the building design and the development of the Waterfront Master Plan.

Send your questions or comments to rebuildtherec@fostercity.org.

Events

Past events